The Boardwalk site was purchased in April of 2015, envisioned as the next generation of Southern California office space. Over the course of the design and construction process, the team was dedicated to creating a world-class experience.

Spectrum Facades contributing to the aesthetics of The Boardwalk Towers

The Boardwalk Towers

Completion:
2017

 

Location:
Irvine California

 

Installer:

 

Architect:

 

Material:
Meteon NW05 & NW06

Trespa® Meteon® was selected in NW05 Loft Brown and NW06 Montreux Amber to clad the exterior of this 550,000 square-foot facility. The Boardwalk project is a LEED Gold pre-certified, speculative Class-A office development and is comprised of two nine-story towers.

After the completion of the Boardwalk Towers in September of 2017, it has emerged as Orange County’s most iconic workplaces due to its cutting edge architectural design and highly functional outdoor space.

READY TO WORK WITH OUR TEAM?

Related Projects